51ԹPro

Tmt comp background

Image Gallery

7950 tio tmt 0052
March 24th, 2023

Close view of the IRIS instrument attached to the NFIRAOS adaptive optics system. This image shows one of TMT Nasmyth platforms with the IRIS instrument, a first-light adaptive optics fed spectro-imager, attached below the (blue) enclosure of TMT’s adaptive optics facility NFIRAOS. IRIS cable wrap is the circular containment below IRIS, on the floor of the Nasmyth platform. IRIS is attached with supporting rods that are also used to absorb vibrations. The top part of IRIS hosts the instrument wavefront sensors, which work with NFIRAOS to further improve IRIS image quality. Below is attached the cryostat which cools the optical components of the imager (top) and spectrograph (bottom) at -200 deg. Celsius. NFIRAOS can hold up to three instruments and a first-decade AO-fed instrument, which is not yet selected but could be a near-infrared multi-object spectrograph, is seen attached on the side of NFIRAOS enclosure. Two day workers are shown near the instrument to provide a perception of the size of TMT instruments. The ventilation vents are opened and let the air and light enter the inside of TMT enclosure.

7950 tio tmt 0026
March 24th, 2023

View of the telescope structure and mirrors through the enclosure opening. The inside of the dome is illuminated to show the opened ventilation vents on the side, one of the two Nasmyth platforms to the left, and the telescope in an inclined position with its primary, secondary and tertiary mirrors. The secondary mirror is seen in reflection on the primary mirror. The back of the secondary mirror shows the small launch telescope which is used to propagate the laser light to form an artificial laser guide star to be used for image correction by TMT’s adaptive optics system.

7950 tio tmt 0006
March 24th, 2023

Image of the night sky and milkyway seen through the telescope enclosure opening. The secondary mirror and its six spiders (supporting beams) is seen across the nighttime sky, reflecting the surface of the primary mirror with the shadow of the secondary mirror and spiders in the center.

7950 tio tmt 0001
March 24th, 2023

Fisheye view of the telescope primary mirror and telescope structure in broad daylight. The telescope is pointing vertically in direction of the circular enclosure opening. The secondary mirror, convex in shape, is seen against the sky background, held above the primary mirror by six structural beams (called “secondary mirror spiders”). The flat oval tertiary mirror is seen in the middle of the primary mirror, whose hexagonal segments are clearly defined in this image. To the left of the primary mirror sits the first-light instrument WFOS, a multi-object spectrograph working in seeing-limited mode. To the right, behind the telescope structure, we can spot the blue container hosting TMT’s adaptive system NFIRAOS. A telescope structure access platform can be seen partly on the top of the image.

Us eltp grouppicture01.11.2023
January 13th, 2023

The US-ELTP group picture in the Seattle Convention Center for AAS 241 in Seattle, Washington.

220614 aas240 9965
June 16th, 2022

TMT and US-ELTP attendees at US-ELTP's booth at the 240th annual American Astronomical Society conference.

Us eltp press release graphic facebook   linkedin
November 5th, 2021

The US Extremely Large Telescope Program illustration

Ocdm scienceop.phases
October 1st, 2021

TMT science operations include activities and user services cycling from proposal submission to the preparation and execution of observing programs, and finally process and archive of the data collected at the telescope.

Ocdm 24htimesummitshifts
October 1st, 2021

Diagram showing the coordination of the various teams involved in supporting TMT operations over a 24h cycle.

Ocdm chronogramtmtop
October 1st, 2021

This figure shows the transition from construction to operations through subsystem Fabrication/Integration and Testing (INT), Construction, Assembly, Integration and Verification (CAIV), Science and Operations Commissioning (SOC) and the period of early operations leading to steady-state operations (some acronyms are used to denote different levels of reviews: Pre-Shipment Review (PSR), Site Acceptance Review (SAR), Final Acceptance Review (FAR) and Science Readiness Review (SRR)).

Ocdm opticalsystmaintenance
October 1st, 2021

This Figure shows the various activities involved in the maintenance and cleaning of TMT optics, with their duration and the number of personnel allocated. This is a preliminary allocation which will be updated as the workflows are finalized.


Displaying entries 25 - 36 of 49 in total