51³Ô¹ÏPro

Tmt comp background

Image Gallery

Fig3
March 8th, 2018

Dr. Warren Skidmore and colleagues from TMT International Science Development Teams (ISDTs) receiving the award.

Fig4
March 8th, 2018

Dr. Warren Skidmore, TMT System Scientist, revealing the Research in Astronomy and Astrophysics (RAA) award during TMT Science Forum -Nov. 7-9, 2017.

Slide1
February 22nd, 2018

From left: Large granite slab is mined, Granite slab is coarse cut, Transportation of granite to Nanjing, Granite Slab has been ground down to a 5m rotational table, Rear Surface of Granite Table Polished, Large Rotational Gear under Fabrication, Rotational Table Base Structure & Centre Connection, Base being lowered into pit, Base in position.

Full assembly
February 22nd, 2018

Setup for NIAOT Continuous Polishing of TMT Segments

Img 20180111 152602468 edited
February 15th, 2018

Participants of TMT Common Software development in ThoughtWorks office in Pune, India. - January 2018 -

Img 20180111 152918035 edited
February 15th, 2018

Members of TMT Common Software team gathering in front of ThoughtWorks headquarters in Pune, India. - January 09, 2018

Img 8897 processed
February 1st, 2018

First parts for the USA Segment Support Assemblies, and some of the TMT Project Office team members involved in this program (left to right): Robert Anderson (Lead Quality Assurance Engineer and Work Package Manager), Bryan Smith (Quality Assurance and Testing Engineer), Fred Kamphues (Senior Opto-mechanical Engineer), Pratheep Eamranond (Lead Contracts Specialist), Christina Wong (Associate Contracts Specialist) and Alan Tubb (Associate Opto-mechanical Engineer).

Tmt optics facility india
January 9th, 2018

TMT Quality Assurance and Safety engineers Bryan Smith and Robert Anderson, accompanied by IIA Postdoctoral Fellow Dr. Vineeth Valsan and IIA Optics Engineer Manoj visiting the construction of the new optics facility dedicated to TMT primary mirror segment production.

Tmt primary mirror arrival
January 9th, 2018

The mirror blank was stored in a 20 feet container by NYK line, one of Japan’s biggest shipping companies, and transported by sea from Tokyo to Chennai via Singapore. The mirror blank arrived at the Centre for Research and Education in Science and Technology (CREST) on December 1, 2017.

Observatory rendering 1 25 18mr
November 14th, 2017

Cross sectional view of TMT enclosure revealing the observatory structure and components.


Displaying entries 229 - 240 of 301 in total