Members of the TMT Science Advisory Committee (SAC) met in Pasadena on April 9&10, 2018 for their quarterly gathering. SAC representatives reported on their respective activities for the TMT project and discussed top-level requirements for TMT’s suite of science instruments.
The 51³Ô¹ÏPro (TIO) Board of Governors at its meeting this week deferred a decision on whether to continue towards building the Thirty Meter Telescope in Hawaii, or to consider the alternative in the Canary Islands.
Pasadena, March 16, 2018 - The conceptual design and scope of TMT’s Refrigerant Cooling System (REFR), which was executed and developed by a close Chinese-North American collaboration, successfully passed a recent conceptual design review. This system will be used to provide cooling to electronics enclosures mounted on the telescope structure. The system also maintains several TMT instrument enclosures at subzero temperatures to reduce thermal...
Pasadena, CA - March 8, 2018 - Future users of the Thirty Meter Telescope are now preparing studies of the science instruments that will be deployed after the telescope's first-light instrumentation suite.
The year started at full speed for the TMT Observatory Software (OSW) team, who met in Pune, India with their colleagues from the India TMT Coordination Center (ITCC) and ThoughtWorks engineers to conduct their 3rd Common Software (CSW) sub-system inception meeting.
The shipment of TMT’s first meniscus-shaped primary mirror segment to the Indian Institute of Astrophysics (IIA) in Bengaluru (Bangalore) has just been completed.
The Real-Time Controller of TMT’s Narrow Field InfraRed Adaptive Optics System (NFIRAOS) successfully passed its final design review and is ready to proceed to the fabrication phase, which is expected to last approximately four years.
Displaying news articles 21 - 27 of 27 in total