TMT data mangement team passed their final design review for the data management system.
The US-ELTP's response to the NSF's US-ELTP External Evaluation Panel Report.
TIO staff attend the graduate student event at UCLA to explain TMT engienering and science to the next generation of scientists and engineers.
Timelapse videos of the testing of the segment support assembly.
TIO staff attend the US-ELTP booth at the Society of Hispanic Professional Engineers conference.
TIO passed the final design review of systems designed to cool the telescope and instruments during operations.
TIO's released its scientific vision for the future: the 2024 Detailed Science Case.
The Alignment and Phasing System (APS) team has progressed to the Final Design stage after successfully completing the Preliminary Design Review (PDR) for the APS Optical Bench and Instrument Control System (ICS).
The Thirty Meter Telescope (TMT) International Observatory (TIO) successfully completed a design review for a critical component of the primary mirror segment control system.
The TIO Secondary Mirror Support System and Positioner Assembly team successfully completed its Preliminary Design Review on 2024 July 15–17.
Displaying news articles 1 - 10 of 27 in total